Skip to product information
1 of 1

Smart Battery System Development

BlueSolar MPPT75/10 Victron Energy BlueSolar MPPT75/10A 12V/24V 10A Solar Charge Controller SCC010010050R

BlueSolar MPPT75/10 Victron Energy BlueSolar MPPT75/10A 12V/24V 10A Solar Charge Controller SCC010010050R

Regular price $149.45 AUD
Regular price Sale price $149.45 AUD
Sale Sold out

BlueSolar MPPT75/10A solar charge controller from Victron Energy with:

  • 12V/24V auto select battery voltage
  • 10A rated charge current
  • 145W @12V or 290W @24V maximum PV power
  • Automatic load disconnect
  • 98% peak efficiency
  • Reverse polarity (fuse) protection, output short circuit protection, over temperature protection

Ultra fast Maximum Power Point Tracking (MPPT)

Especially in case of a clouded sky, when light intensity is changing continuously, an ultra fast MPPT controller will improve energy harvest by up to 30% compared to PWM charge controllers and by up to 10% compared to slower MPPT controllers.

Load output

Over-discharge of the battery can be prevented by connecting all loads to the load output. The load output will disconnect the load when the battery has been discharged to a preset voltage.

Alternatively, an intelligent battery management algorithm can be chosen: see BatteryLife. The load output is short circuit proof. Some loads (especially inverters) can best be connected directly to the battery, and the inverter remote control connected to the load output. A special interface cable may be needed, please see the manual.

BatteryLife: intelligent battery management

When a solar charge controller is not able to recharge the battery to its full capacity within one day, the result is often that the battery will be continually be cycled between a “partially charged” state and the “end of discharge” state. This mode of operation (no regular full recharge) will destroy a lead-acid battery within weeks or months.

The BatteryLife algorithm will monitor the state of charge of the battery and, if needed, day by day slightly increase the load disconnect level (i. e. disconnect the load earlier) until the harvested solar energy is sufficient to recharge the battery to nearly the full 100%. From that point onwards the load disconnect level will be modulated so that a nearly 100% recharge is achieved about once every week.

Real-time data display options

  • Apple and Android smartphones, tablets and other devices: see the VE.Direct to Bluetooth low energy dongle
  • ColorControl panel
View full details